Archive: Gallery (Format)

424

11

Dec2015
An emerging trend in new buildings and major refurbishments; End-of-Trip facilities are typically identified as shower, bathroom and storage facilities for people biking to work. From a leasing perspective though, these facilities have now become a significant draw card for blue chip tenants and some fitouts are superb.
5×4 project_3

08

Dec2015
Automatic Heating is pleased to be an official Project Partner of the 5×4 Hayes Lane Project. Named after the physical constraints imposed on the site – a 5m x 4m plot of land in East Melbourne – the project aims ... Read More
Prefab Plant Room

27

Jul2015
Prefabrication is the practice of assembling components offsite, and moving them to the building site where they are placed into position. While nothing new, the practice is an emerging one in the HVAC industry and the advantages are significant.Why ... Read More

26

Feb2015
Automatic Heating recently had the opportunity to assist Box Hill TAFE with the provision of a training pod for use in the Refrigeration and Climate Control Centre of Excellence at Box Hill Institute.