Grenda Aquatic Centre

Project Overview

Officially opened at Haileybury College Keysborough in 1995, Grenda Aquatic Centre features a 50 metre indoor swimming and diving pool. The water heating system was recently upgraded and is now powered by 3 x 150kW Meridian Condensing Water Heaters with a cascade controller which provides sequence control and maximises efficiency.

Ex-stock availability of the Meridian CWH’s facilitated the quick changeover during the Christmas shutdown period.

Featuring stainless steel flues, an expansion tank and plate heat exchanger, this tidy installation is a credit to the installer Sinan Mustafa of UPR Plumbing Services Pty Ltd.

Key Products

Project Images